Paver Base and Bedding Sand Calculator

Size the compacted base and the bedding sand for a paver patio, including the base that sticks out past the edge. Paver square footage, edge restraint, and excavation sit under the same job so the sand is not the only number you take to the yard.

Paver area

Feet, or feet and inches such as 12 ft 6 1/2 in.

Feet, or feet and inches such as 12 ft 6 1/2 in.

A cutout inside the patio. Use 0 for a full rectangle. A subtraction switches the base to area plus perimeter times the extension.

Base

Sets a compacted base depth. Well-drained pedestrian work starts at 4 inches, poor drainage at 6, vehicular planning at 8.

Placed in lifts no thicker than about 4 to 6 inches.

1.40 is the loose starting point for crushed aggregate base.

This example uses 20% so the tons can be checked by hand. A usual starting point for crushed base is 25%.

Sensible default: 0%. Compaction is already in the allowance above. Use 5% if you want loose material beyond that.

6 inches past the paver edge is a common start. A rectangle becomes (length + 2 × extension) by (width + 2 × extension).

The ton order rounds up to this step.

Bedding sand

Nominal bedding is 1 inch, generally between 3/4 and 1 1/2 inches. Sand is calculated on the paver area, not the extended base.

Sensible default: 5% for screed loss. The example is 1 inch plus 5%.

Bulk sand often sells in 0.5 cubic yard steps, rounded up.

Also on this patio

Sensible defaults: running bond 5%, herringbone 10%, diagonal or curves 15%, heavy curves 20–25%. This changes paver area only.

Used for excavation depth. 2 3/8 in is a common 60 mm paver.

Subtracted from the perimeter for edge restraint. The example drops one 20 ft house side.

Loose load divided by bank volume. 1.25 is the starting point for ordinary soil.

Order this

Working…

Base

Base area
—
Compacted volume
—
Loose volume
—
Exact tons
—
Order
—
Leftover after rounding
—
Lifts at 6 inches maximum
—

Bedding sand

Before the screed allowance
—
With the screed allowance
—
Order
—
Weight at 1.35 ton/yd³
—

Also on this patio

Pavers with pattern waste
—
Edge restraint
—
Excavation, bank measure
—
Haul-off, loose
—

With these numbers

Units and assumptions

Input units
Patio length and width in feet. Depths, paver thickness, and the base extension in inches. Metric mode uses meters and centimeters.
Density default
Base 1.40 loose short tons per cubic yard. Bedding sand weight is shown at 1.35. Basis: published loose figures for crushed base and concrete sand.
Compaction
Base is compacted. Pedestrian depth starts at 4 inches on well-drained soil and 6 inches on poor drainage. The usual base allowance is 25%. This example uses 20% so the tons can be checked. Vehicular depth is planning only.
Waste
Pattern waste defaults: 5% running bond, 10% herringbone, 15% diagonal or curves, 20–25% heavy curves. Screed allowance default 5%. Base waste default 0%, because compaction is already counted.
Rounding
Base tons round up to the next 0.5 ton. Bedding sand rounds up to the next 0.5 cubic yard. The base extends 6 inches past a rectangular edge.
Supplier check
Results are estimates. Confirm quantities with your supplier. These depths are not a pavement design.

The formula

For a rectangle, base area = (length + 2 × extension) × (width + 2 × extension), with the extension in feet. Any other outline uses paved area + perimeter × extension. Base cubic yards = that area × compacted depth ÷ 324, then × (1 + compaction allowance) for the loose load, then × loose density for tons. The ton order rounds up.

Bedding sand uses the paver area, not the extended base: cubic yards = area × sand depth ÷ 324 × (1 + screed allowance). A nominal bed is 1 inch of concrete sand. The sand order rounds up in cubic yards.

Excavation depth is base + sand + paver thickness. Bank cubic yards use the base area. Loose haul-off is bank × swell. Edge restraint is the perimeter minus any side that already butts a structure. Pattern waste changes the paver square footage only. Joint sand has its own page.

Worked example

A 16 by 20 foot patio is 320 square feet. Pedestrian, well-drained soil, herringbone (10% pattern waste), 4 inch compacted base, 20% compaction allowance, 1.40 loose tons per cubic yard, base extended 6 inches, 1 inch of bedding sand plus 5%, pavers 2 3/8 inches thick, one 20 foot side against the house, haul-off swell 1.25.

Starting points

Pedestrian base depths used here follow common interlocking-concrete guidance: about 4 inches compacted on well-drained soil and about 6 inches where drainage is poor. Vehicular sections are often thicker. Eight inches is a conservative planning depth on this page, not a code value and not a design. Bedding is concrete sand at about 1 inch, not stone dust. The base usually extends past the paver edge, 6 inches on this form.

SettingStarting pointNote
Pedestrian base, well drained4 in compactedPoor drainage: 6 in.
Vehicular planning depth8 in compactedNot a pavement design. Confirm the section.
Base density and allowance1.40 ton/yd³, often 25%The example uses 20% so the 7.40 ton figure can be checked.
Extension6 in past the edgeA rectangle grows on every side.
Bedding1 in concrete sand, plus 5%Thicker than 1.5 in is flagged.
Pattern waste5 / 10 / 15 / 20%Running bond, herringbone, diagonal or curves, heavy curves.

Questions

How much base do I need under a paver patio?

A 16 by 20 foot patio with the base extended 6 inches is 357 square feet. At 4 inches compacted, 20% extra loose volume, and 1.40 tons per cubic yard, that is 7.40 tons, which orders as 7.50 tons.

How much bedding sand per square foot?

One inch of sand over 320 square feet is 0.988 cubic yards before the screed allowance and 1.037 cubic yards with 5%. The half-yard step rounds that up to 1.50 cubic yards.

Should the base extend past the pavers?

Yes, typically. Six inches past the edge is the starting point here. On a rectangle that means the base is longer and wider than the pavers by twice the extension.

Can I use stone dust for bedding?

No. Bedding should be concrete sand. Stone dust holds water. The form will warn you if you pick it, and it will still do the volume math so you can see the quantity you should be replacing with sand.